ASDA, Plymouth
A major refurbishment of ASDA Plymouth.
Project Description
In particularly challenging conditions, the ventilation system on the roof had perished and required replacing. It was brought back up to standard by our team by using the latest methods and materials to ensure the replacement would be long lasting and effective.
Work Carried Out
- External Ventilation Supply Duct Work
- External Ventilation Return Duct Work