Thatchers.

Part of their global reach plan, expansion various works over the previous 3 years.

Thatchers Side Image

Sector: Industrial
Location: Bristol

Project Timeline: Previous 3 Years
Completed: Ongoing

Value: Project not completed

Project Description:

Specialist trace heating for the pipes transporting a sugar-based liquid, that it was imperative to keep at a certain temperature to ensure that the liquid did not begin to solidify, and it could continue flowing to the production line.

 

Work Completed:

  • Thermal Insulation and Trace Heating
  • Steam System
  • Boarhole Pipework
  • Vessels and Tanks
  • Sugar Line Trace Heating