Bristol Airport.

Remodelled the entire baggage reclaim area of the airport.

Bristol Airport Side Image

Sector: Commercial
Location: Bristol

Project Timeline: 6 Months
Completed: September 2017

Value: £15,000

Project Description:

After having worked at Bristol Airport on other projects, this contract was awarded to remodel and increase the size of the baggage reclaim and security area of the airport, including toilet and wash facilities and ventilation services; enabling the remodelling of various areas as part of the wider 10 year plan.

 

Work Completed:

  • Thermal Insulation and Trace Heating
  • Domestic Hot and Cold Pipework
  • Heating Pipework
  • Ventilation Supply and Return Duct Work
  • Plantroom Services