Ashton Gate Stadium.

Thermal insulation and trace heating for Bristol City Football Club’s Ashton Gate Stadium.

Ashton Gate Side Image

Sector: Commercial
Location: Bristol

Project Timeline: 2 Years
Completed: August 2016

Value: £230,000

Project Description:

We provided the thermal insulation and trace heating for Bristol City Football Club’s Ashton Gate stadium throughout a two-phase project. Phase 1 consisted of the completion of the South Stand, a complete new build and the East Stand, a remodel of the existing.

Phase 2 was a complete rebuild of the West Stand, which included where the hospitality suites are positioned which required a huge amount of works.

Once complete the stadium has now become a 27,000 all seater stadium boosting 18 executive boxes and various levels of hospitality suites.

 

Work Completed:

  • Thermal Insulation and Trace Heating
  • Domestic Hot and Cold Pipework
  • Heating Pipework
  • Ventilation Supply and Return Duct Work
  • Plantroom Services